• Requires 6-7 people for labor depending whether capsule application is required. Please review contract for more details

  • All access points to bottling site need to be cleared of any low hanging branches and provide a minimum of 10' foot wide clearance.

Power requirements for the trailer are 240 volt, 3 phase, 50-60 amps or feel free to rent a generator